2007- 2008 Feasibility Studies on Uliastai-Mogoingol-Murun Soums 110 kV Power Transmission Line and Mogoingol coal mining based Power Plant

The Feasibility Studies on Uliastai-Mogoingol-Murun 110 kVPower Transmission Line and Mogoingol coal mining based Power Plant were prepared. Length is approximately 550 km. Feasibility study on the coal fired power plant between Uliastai and Murun by using Mogoingol mining coal. This power transmission line will connect the Central region energy system to the Eastern (isolated) power grid. Feasibility study on the coal fired power plant between Uliastai and Murun by using Mogoingol mining coal.Studies were performed for the improving the Mogoingol coal mining. Studies on the Central Energy System, energy forecast for year 2007-2020, Sustainable Energy Development strategy, energy consumption, energy balance and forecast in Ulaistai, Telmen, Mogoingol and Moron Soums, options for 110 kV power transmission lines etc. Feasibility studies on the Mogoingol coal mine based Power Plant included: power plant selection, central region power grid,forecast and balance for electric load, role of the plant in the grid, plan for connecting the plant to the grid, location of the plant, coal supply scheme,coal quality, coal transporting, boiler & turbine selection, selection of the plant location, geological studies, ash disposal areas, project planning:capacity of the plant, construction schedule, general plan view of the plant,selection of the unit size, coal conveying, water supply, ash & slug removal, water treatment, electric equipment, flue gas desulfurization,environment protection, environment control, protection of soil, economical assessment, investment needs, financial and economical analysis, conclusions etc.Studies will include the assessment & improvement of the Mogoingol coal mining.

Year: 2007-2008

Client: Ministry of Fuel & Energy, Mongolia

Financed by: State fund